Suez Wind Energy BOO Wind Power Plant 1.1 GW - SWE North (PLOT 1) Bat Addendum Report

Checklist
Latest version published by Plazi.org taxonomic treatments database on Feb 12, 2026 Plazi.org taxonomic treatments database

Download the latest version of this resource data as a Darwin Core Archive (DwC-A) or the resource metadata as EML or RTF:

Data as a DwC-A file download 4 records in English (8 KB) - Update frequency: unknown
Metadata as an EML file download in English (5 KB)
Metadata as an RTF file download in English (5 KB)

Description

This dataset contains the digitized treatments in Plazi based on the original book / thesis / monograph EcoConServ, ECO Consult Jude Center (2024): Suez Wind Energy BOO Wind Power Plant 1.1 GW - SWE North (PLOT 1) Bat Addendum Report. Cairo, Egypt: European Bank for Reconstruction and Development (EBRD), DOI: 10.5281/zenodo.14537375

Data Records

The data in this checklist resource has been published as a Darwin Core Archive (DwC-A), which is a standardized format for sharing biodiversity data as a set of one or more data tables. The core data table contains 4 records.

7 extension data tables also exist. An extension record supplies extra information about a core record. The number of records in each extension data table is illustrated below.

Taxon (core)
4
Occurrence 
8
EOLMediaExtension 
4
EOLReferencesExtension 
4
Description 
4
VernacularName 
4
Distribution 
0
Multimedia 
0

This IPT archives the data and thus serves as the data repository. The data and resource metadata are available for download in the downloads section. The versions table lists other versions of the resource that have been made publicly available and allows tracking changes made to the resource over time.

Versions

The table below shows only published versions of the resource that are publicly accessible.

Rights

Researchers should respect the following rights statement:

The publisher and rights holder of this work is Plazi.org taxonomic treatments database. To the extent possible under law, the publisher has waived all rights to these data and has dedicated them to the Public Domain (CC0 1.0). Users may copy, modify, distribute and use the work, including for commercial purposes, without restriction.

GBIF Registration

This resource has been registered with GBIF, and assigned the following GBIF UUID: 080f87e8-7332-4c71-86b1-ea9f58579b58.  Plazi.org taxonomic treatments database publishes this resource, and is itself registered in GBIF as a data publisher endorsed by Plazi.

Keywords

Checklist

Contacts

EcoConServ
  • Originator
ECO Consult Jude Center
  • Originator
Guido Sautter
  • Point Of Contact
Plazi
Guido Sautter
Plazi

Project Data

No Description available

Title EBRD
Identifier EBRD

The personnel involved in the project:

EBRD Environmental and Social

Bibliographic Citations

  1. EcoConServ, ECO Consult Jude Center (2024): Suez Wind Energy BOO Wind Power Plant 1.1 GW - SWE North (PLOT 1) Bat Addendum Report. Cairo, Egypt: European Bank for Reconstruction and Development (EBRD), DOI: 10.5281/zenodo.14537375

Additional Metadata

Alternative Identifiers 8549F008784BFFF5FF98FF9FFFEE8D0D
080f87e8-7332-4c71-86b1-ea9f58579b58
https://cloud.gbif.org/eca/resource?r=suez_bats